Assembling Y Stage

This is the Y Stage housing in mid-assembly. The steel rods have been passed through the build platform and attached to the Y Stage housing. The ABP’s timing belt is being attached to the Y Stage motor.

14StageYWithMotorRodsABP

Sgt Marshmallow

About Sgt Marshmallow

Sergeant Marshmallow is a cat. More specifically, he is a handsome cat. Sergeant is also the editor of this blog.

Leave a Reply

Your email address will not be published. Required fields are marked *